* A new report is generated daily at 9:30pm Eastern Time.
Security Description | Coupon | Maturity Date | Investor Sold Customer Sold to Dealer (Lowest / Highest) |
Investor Bought Customer Purchase from Dealer (Lowest / Highest) |
Yield Offer Side (Lo Px / Hi Px) |
# of Trades | Dollar Volume | Price Spread |
---|---|---|---|---|---|---|---|---|
Beaverton Ore 075545ND1
|
3.200% | 2037-Jun | - | 86.832 - 86.832 | 4.510 - 4.510 | 2 | $40,000 | |
Beaverton Ore Spl Rev Ser A 075554BD6
|
5.000% | 2027-Jun | 105.580 - 105.580 | - | - | 1 | $10,000 | |
Beaverton Ore Wtr Rev 07556MEX8
|
5.000% | 2032-Apr | - | 107.392 - 107.392 | 3.160 - 3.160 | 2 | $100,000 | |
Beaverton Ore Wtr Rev 07556MFS8
|
5.000% | 2033-Apr | - | 110.240 - 110.240 | 3.200 - 3.200 | 2 | $20,000 | |
Bend Ore 081617SF0
|
5.000% | 2030-Jun | 110.612 - 110.612 | - | - | 1 | $80,000 | |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis Conv Defd Int-ser A 082744CJ0
|
5.000% | 2024-Jun | 100.717 - 100.717 | - | - | 1 | $30,000 | |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis Ser B 082744CV3
|
5.000% | 2028-Jun | 108.356 - 108.356 | 108.424 - 108.424 | 3.001 - 3.001 | 2 | $100,000 | 0.068 |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis Ser B 082744CW1
|
5.000% | 2029-Jun | 108.138 - 108.138 | 107.941 - 108.338 | 3.020 - 3.110 | 4 | $30,000 | 0.2 |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis Ser B 082744DA8
|
5.000% | 2033-Jun | - | 107.023 - 107.023 | 3.320 - 3.320 | 1 | $35,000 | |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis Ser B 082744DB6
|
5.000% | 2034-Jun | - | - | - | 4 | $160,000 | |
Benton & Linn Cntys Ore Sch Dist No 509j Corvallis 082744DQ3
|
5.000% | 2030-Jun | - | 112.109 - 112.109 | 2.950 - 2.950 | 1 | $10,000 | |
Boardman Ore 096582AL5
|
4.000% | 2033-Jun | 102.041 - 102.041 | - | - | 3 | $390,000 | |
Boardman Ore 096582AN1
|
3.000% | 2037-Jun | - | 86.701 - 86.701 | 4.306 - 4.306 | 2 | $70,000 | |
Central Lincoln Ore Peoples Util Dist Elec Rev 153879RE3
|
4.000% | 2025-Dec | 100.799 - 100.799 | - | - | 2 | $30,000 | |
Central Oregon Cmnty College Dist Ore Ref 154742HS2
|
4.000% | 2026-Jun | - | 101.861 - 101.861 | 3.230 - 3.230 | 2 | $20,000 | |
Clackamas & Washington Cntys Ore Sch Dist No 003 Jt Ref 178882MF0
|
5.000% | 2032-Jun | 102.200 - 102.200 | 102.245 - 102.245 | 3.490 - 3.490 | 2 | $10,000 | 0.045 |
Clackamas & Washington Cntys Ore Sch Dist No 003 Jt Ser B 178882PA8
|
5.000% | 2034-Jun | 110.351 - 110.351 | 111.856 - 111.856 | 2.990 - 2.990 | 2 | $30,000 | 1.505 |
Clackamas Cnty Ore Ref 178890MG1
|
5.000% | 2028-Jun | - | 108.931 - 108.931 | 2.870 - 2.870 | 1 | $5,000 | |
Clackamas Cnty Ore Hosp Fac Auth Rev Sr Living-willamette View Proj 179027WR4
|
5.000% | 2052-Nov | 83.313 - 83.313 | - | - | 3 | $330,000 | |
Clackamas Cnty Ore Sch Dist No 007j Lake Oswego Ref 179090KE4
|
5.250% | 2025-Jun | 102.322 - 102.322 | - | - | 3 | $30,000 | |
Clackamas Cnty Ore Sch Dist No 007j Lake Oswego 179090MM4
|
5.000% | 2026-Jun | 104.020 - 104.745 | - | - | 2 | $215,000 | |
Clackamas Cnty Ore Sch Dist No 007j Lake Oswego 179090MT9
|
4.000% | 2032-Jun | 101.700 - 101.700 | - | - | 1 | $55,000 | |
Clackamas Cnty Ore Sch Dist No 007j Lake Oswego 179090PG4
|
5.000% | 2033-Jun | - | 116.046 - 116.046 | 2.860 - 2.860 | 2 | $20,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas Ref 179093GM5
|
5.000% | 2024-Jun | 100.774 - 100.774 | - | - | 1 | $100,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas Defd Int-ser A 179093HL6
|
N/R | 2036-Jun | - | 56.192 - 56.192 | 4.650 - 4.650 | 2 | $20,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas Defd Int-ser A 179093HR3
|
N/R | 2041-Jun | 43.895 - 43.895 | - | - | 1 | $0 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas Ser B 179093JB6
|
5.000% | 2027-Jun | - | 106.079 - 106.079 | 3.170 - 3.170 | 2 | $20,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas Ser B 179093JM2
|
5.000% | 2037-Jun | - | 106.780 - 106.781 | 2.967 - 2.967 | 8 | $560,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas 179093JV2
|
5.000% | 2027-Jun | - | 106.458 - 106.458 | 3.060 - 3.060 | 2 | $40,000 | |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas 179093KB4
|
5.000% | 2033-Jun | 107.015 - 107.015 | 107.465 - 107.465 | 3.219 - 3.219 | 2 | $20,000 | 0.45 |
Clackamas Cnty Ore Sch Dist No 12 North Clackamas 179093KK4
|
5.000% | 2041-Jun | - | 104.873 - 104.873 | 3.820 - 3.820 | 2 | $30,000 | |
Clackamas Cnty Ore Sch Dist No 46 Oregon Trail Ref-ore St Sch Bd Gty 179126DP9
|
5.000% | 2024-Jun | 100.675 - 100.675 | - | - | 1 | $20,000 | |
Clackamas Cnty Ore Sch Dist No 46 Oregon Trail Ref-ore St Sch Bd Gty 179126DQ7
|
5.000% | 2025-Jun | - | 102.832 - 102.832 | 3.100 - 3.100 | 1 | $170,000 | |
Clackamas Cnty Ore Sch Dist No 46 Oregon Trail Ref-ore St Sch Bd Gty 179126DS3
|
5.000% | 2027-Jun | - | 107.362 - 107.362 | 2.800 - 2.800 | 2 | $220,000 | |
Clackamas Cnty Ore Sch Dist No 62 C Oregon City Ref-ser A 179162GH9
|
N/R | 2039-Jun | 45.208 - 45.208 | - | - | 2 | $40,000 | |
Clackamas Cnty Ore Sch Dist No 62 C Oregon City Taxable-pension-ser B 179162KG6
|
0.568% | 2024-Jun | 97.010 - 97.010 | - | - | 1 | $60,000 | |
Clackamas Cnty Ore Sch Dist No 086 Ref-ser A 179198HR0
|
5.000% | 2028-Jun | 107.962 - 107.962 | 108.022 - 108.022 | 3.092 - 3.092 | 2 | $70,000 | 0.06 |
Clackamas Cnty Ore Sch Dist No 086 Ref-ser A 179198HS8
|
5.000% | 2029-Jun | - | 110.231 - 110.231 | 2.982 - 2.982 | 1 | $30,000 | |
Clackamas Cnty Ore Sch Dist No 086 Ref-ser A 179198HX7
|
4.000% | 2034-Jun | 102.350 - 102.350 | - | - | 1 | $20,000 | |
Clackamas Cnty Ore Sch Dist No 086 Ref-ser A 179198JD9
|
4.000% | 2040-Jun | 99.498 - 99.498 | 100.000 - 102.289 | 3.604 - 4.000 | 15 | $490,000 | 2.791 |
Clackamas River Wtr Ore Wtr Rev 17939MBY6
|
5.000% | 2030-Nov | 101.581 - 101.581 | - | - | 1 | $25,000 | |
Clatsop Cnty Ore 182765BH9
|
5.000% | 2030-Jun | - | 109.493 - 109.493 | 3.120 - 3.120 | 2 | $100,000 | |
Clatsop Cnty Ore Sch Dist No 001c Defd Int-ser A 182810BV2
|
N/R | 2043-Jun | - | 38.746 - 38.746 | 4.912 - 4.912 | 4 | $300,000 | |
Clatsop Cnty Ore Sch Dist No 001c Ser B 182810BX8
|
5.000% | 2030-Jun | - | 109.334 - 109.867 | 3.050 - 3.150 | 3 | $105,000 | |
Clatsop Cnty Ore Sch Dist No 010 Ser B 182846BZ7
|
5.000% | 2026-Jun | 104.190 - 104.190 | - | - | 1 | $25,000 | |
Clatsop Cnty Ore Sch Dist No 010 Ser B 182846CB9
|
5.000% | 2028-Jun | 106.208 - 106.208 | - | - | 1 | $250,000 | |
Clatsop Cnty Ore Sch Dist No 30 Warrenton-hammond Ser B 182855EU6
|
5.000% | 2026-Jun | 104.441 - 104.441 | - | - | 1 | $250,000 | |
Columbia & Wash Cntys Ore Sch Dist No 47j Vernonia Deferred Int-ser A 19719CBS3
|
N/R | 2044-Jun | 35.455 - 35.455 | - | - | 4 | $880,000 | |
Columbia Cnty Ore Sch Dist No 502 197558EC9
|
5.000% | 2028-Jun | 106.606 - 106.606 | 106.661 - 106.661 | 3.002 - 3.002 | 2 | $110,000 | 0.055 |
Condon Ore Sch Dist No 25j Defd Int-ser A 20675PBQ8
|
N/R | 2024-Jun | 97.785 - 97.785 | 97.785 - 97.785 | 4.200 - 4.200 | 2 | $20,000 | 0 |
Coos Cnty Ore Sch Dist No 009 Coos Bay 21709EAW9
|
4.000% | 2026-Jun | - | 102.057 - 102.057 | 3.150 - 3.150 | 2 | $20,000 | |
Coos Cnty Ore Sch Dist No 009 Coos Bay 21709EBA6
|
5.000% | 2030-Jun | - | 107.547 - 107.547 | 3.200 - 3.200 | 2 | $90,000 | |
Cottage Grove Ore 221687CM6
|
4.000% | 2028-Jun | - | 103.158 - 103.158 | 3.240 - 3.240 | 1 | $45,000 | |
Crook Cnty Ore Conv Cap Apprec 227178DM9
|
N/R | 2037-Jun | 88.045 - 88.045 | 88.105 - 88.536 | 0.904 - 0.940 | 4 | $310,000 | 0.491 |
Deschutes Cnty Ore Ref 250316QW9
|
5.000% | 2028-Jun | 108.209 - 108.209 | - | - | 2 | $200,000 | |
Deschutes Cnty Ore Administrative Sch Dist No 1 250325TA5
|
4.000% | 2028-Jun | 102.525 - 102.525 | 103.061 - 103.061 | 3.080 - 3.080 | 2 | $170,000 | 0.536 |
Deschutes Cnty Ore Administrative Sch Dist No 1 250325TF4
|
3.000% | 2033-Jun | 89.970 - 89.970 | - | - | 3 | $170,000 | |
Deschutes Cnty Ore Administrative Sch Dist No 1 250325TW7
|
5.000% | 2030-Jun | - | 109.493 - 109.493 | 3.120 - 3.120 | 2 | $20,000 | |
Deschutes Cnty Ore Administrative Sch Dist No 1 250325VD6
|
5.000% | 2033-Jun | - | 117.490 - 117.490 | 2.889 - 2.889 | 1 | $40,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys-ser A 250336DL5
|
5.000% | 2024-Jan | 99.977 - 99.977 | - | - | 1 | $125,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys-ser A 250336DM3
|
5.000% | 2025-Jan | - | 100.990 - 100.990 | 4.053 - 4.053 | 3 | $30,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys-ser A 250336DR2
|
5.000% | 2029-Jan | - | 101.960 - 101.960 | 4.008 - 4.008 | 3 | $60,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys-ser A 250336DZ4
|
3.250% | 2045-Jan | - | 75.397 - 75.397 | 5.182 - 5.182 | 4 | $40,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys Inc-ser 250336EM2
|
5.000% | 2031-Jan | 105.398 - 105.398 | 105.598 - 105.598 | 4.081 - 4.081 | 2 | $50,000 | 0.2 |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys Inc-ser 250336ES9
|
4.000% | 2036-Jan | 96.714 - 96.714 | 96.864 - 96.864 | 4.336 - 4.336 | 2 | $50,000 | 0.15 |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys Inc-ser 250336ET7
|
4.000% | 2037-Jan | - | 97.931 - 97.971 | 4.203 - 4.207 | 6 | $165,000 | |
Deschutes Cnty Ore Hosp Facs Auth Hosp Rev St Charles Health Sys Inc-ser 250336EU4
|
4.000% | 2038-Jan | 92.361 - 92.361 | 92.511 - 92.511 | 4.734 - 4.734 | 2 | $40,000 | 0.15 |
Deschutes Cnty Ore Sch Dist No 6 Sisters 250351GQ0
|
4.000% | 2033-Jun | - | 104.909 - 104.909 | 3.260 - 3.260 | 1 | $10,000 | |
Deschutes Ore Pub Libr Dist 250353AV1
|
4.000% | 2026-Jun | 101.883 - 101.883 | - | - | 1 | $55,000 | |
Deschutes Ore Pub Libr Dist 250353BC2
|
4.000% | 2033-Jun | 103.390 - 104.494 | 105.228 - 105.228 | 3.210 - 3.210 | 4 | $275,000 | 1.838 |
Deschutes Ore Pub Libr Dist 250353BD0
|
4.000% | 2034-Jun | - | 104.279 - 104.279 | 3.350 - 3.350 | 1 | $10,000 | |
Deschutes Ore Pub Libr Dist 250353BL2
|
3.000% | 2041-Dec | 78.570 - 78.570 | - | - | 1 | $15,000 | |
Douglas Cnty Ore Sch Dist No 77 Glendale 259497BC8
|
3.000% | 2027-Jun | - | 98.651 - 98.651 | 3.408 - 3.408 | 2 | $50,000 | |
Eugene Ore Elec Util Rev Ref-sys 298191H59
|
3.750% | 2042-Aug | - | 87.804 - 87.804 | 4.741 - 4.741 | 2 | $40,000 | |
Eugene Ore Elec Util Rev Ref-ser A 298191L70
|
5.000% | 2026-Aug | 104.520 - 104.520 | - | - | 2 | $70,000 | |
Eugene Ore Elec Util Rev Ref-ser A 298191L88
|
5.000% | 2027-Aug | 104.014 - 104.339 | 104.289 - 104.539 | 3.209 - 3.305 | 4 | $40,000 | 0.525 |
Eugene Ore Elec Util Rev 298191Q91
|
5.000% | 2041-Aug | - | 105.821 - 105.821 | 3.297 - 3.300 | 2 | $100,000 | |
Fairview Ore Taxable-ser A 305819BV5
|
4.000% | 2026-Mar | 91.422 - 91.422 | 91.422 - 91.422 | 8.250 - 8.250 | 2 | $20,000 | 0 |
Forest Grove Ore Rev Ref-campus Impt-pacific Univ 345648DR7
|
4.000% | 2045-May | 78.950 - 78.950 | - | - | 3 | $30,000 | |
Grants Pass Ore Wastewater Rev 388379AA7
|
4.000% | 2029-Dec | 100.974 - 100.974 | 101.926 - 101.926 | 3.480 - 3.480 | 4 | $180,000 | 0.952 |
Grants Pass Ore Wastewater Rev 388379AJ8
|
4.000% | 2037-Dec | - | 100.219 - 100.219 | 3.940 - 3.940 | 3 | $65,000 | |
Greater Albany Sch Dist No 8j Ore 391554BM3
|
4.000% | 2027-Jun | - | 102.487 - 102.487 | 3.250 - 3.250 | 2 | $20,000 | |
Greater Albany Sch Dist No 8j Ore 391554BP6
|
5.000% | 2029-Jun | 105.932 - 105.932 | - | - | 1 | $50,000 | |
Greater Albany Sch Dist No 8j Ore 391554CD2
|
5.000% | 2027-Jun | 106.630 - 106.630 | - | - | 1 | $25,000 | |
Gresham Ore Ref-proj Obligs 397730SA1
|
5.000% | 2025-May | 101.858 - 101.858 | - | - | 2 | $20,000 | |
Gresham Ore Wtr Rev 397774FH8
|
5.000% | 2029-Jun | 110.452 - 110.452 | - | - | 1 | $135,000 | |
Gresham Ore Wtr Rev 397774GA2
|
2.250% | 2046-Jun | - | 63.510 - 63.510 | 4.960 - 4.960 | 4 | $40,000 | |
Harrisburg Ore 414720FN7
|
4.000% | 2035-Jun | - | 101.233 - 102.330 | 3.530 - 3.750 | 5 | $275,000 | |
Hermiston Ore 427542LY9
|
3.000% | 2026-Mar | 97.333 - 97.333 | - | - | 2 | $30,000 | |
Hermiston Ore Ref-obligs 427542NB7
|
4.000% | 2040-Jun | 96.954 - 96.954 | 99.391 - 99.391 | 4.051 - 4.051 | 3 | $60,000 | 2.437 |
Hillsboro Ore 432092TD6
|
5.000% | 2030-Jun | 109.721 - 109.721 | - | - | 1 | $50,000 | |
Hillsboro Ore Wtr Rev Sys 432134BK9
|
5.000% | 2028-Jun | 108.269 - 108.269 | - | - | 1 | $50,000 | |
Home Forward Ore Multifamily Hsg Rev Ref-gretchen Kafoury Coms 43711CBB8
|
4.000% | 2034-Jan | 97.866 - 97.866 | - | - | 4 | $100,000 | |
Home Forward Ore Multifamily Hsg Rev Ref-lovejoy Station Apts 43711CBN2
|
3.000% | 2033-Jul | 89.540 - 89.540 | - | - | 2 | $50,000 | |
Hood River Cnty Ore Sch Dist Ref 438811CZ2
|
4.000% | 2024-Jun | 100.201 - 100.201 | - | - | 1 | $150,000 | |
Independence Ore Swr Rev Ref 45378GAL7
|
3.500% | 2040-Jun | - | 85.120 - 85.120 | 4.818 - 4.818 | 2 | $20,000 | |
Independence Ore Ref-city Hall Projs-ser A 453907EQ6
|
4.000% | 2030-Jun | 100.133 - 100.133 | - | - | 1 | $15,000 | |
Irrigon Ore Ref 463587CC7
|
4.000% | 2037-Dec | - | 99.950 - 99.950 | 4.005 - 4.005 | 3 | $75,000 | |
Jackson Cnty Ore Sch Dist No 005 Ashland 467736DP6
|
5.000% | 2027-Jun | 106.774 - 106.774 | 107.117 - 107.117 | 2.870 - 2.870 | 2 | $425,000 | 0.343 |
Jackson Cnty Ore Sch Dist No 006 Central Point Ser A 467754HJ9
|
5.000% | 2029-Jun | 110.797 - 110.797 | 111.376 - 111.376 | 2.770 - 2.770 | 4 | $720,000 | 0.579 |
Jackson Cnty Ore Sch Dist No 006 Central Point Ser A 467754HM2
|
5.000% | 2032-Jun | 109.001 - 109.001 | 109.201 - 109.201 | 3.175 - 3.175 | 2 | $20,000 | 0.2 |
Jackson Cnty Ore Sch Dist No 006 Central Point Ser A 467754HP5
|
4.000% | 2034-Jun | - | 101.991 - 101.991 | 3.600 - 3.600 | 6 | $800,000 | |
Jackson Cnty Ore Sch Dist No 006 Central Point Ser A 467754HS9
|
4.000% | 2037-Jun | - | 101.258 - 101.258 | 3.746 - 3.746 | 1 | $15,000 | |
Jackson Cnty Ore Sch Dist No 549c Medford Ref 468034PE7
|
5.000% | 2026-Dec | 102.380 - 102.380 | - | - | 1 | $250,000 | |
Jefferson Cnty Ore Sch Dist No 509j 473448FK9
|
4.000% | 2027-Jun | 103.000 - 103.000 | - | - | 1 | $100,000 | |
Lake Oswego Ore 510390E86
|
5.000% | 2031-Jun | 112.246 - 112.343 | - | - | 4 | $370,000 | |
Lake Oswego Ore 510390F28
|
5.000% | 2033-Jun | - | 110.859 - 110.859 | 3.140 - 3.140 | 2 | $30,000 | |
Lake Oswego Ore Ref-full Faith & Cr Obligs 510390J32
|
5.000% | 2033-Jun | 118.366 - 118.366 | 118.698 - 118.698 | 2.750 - 2.750 | 2 | $950,000 | 0.332 |
Lake Oswego Ore Ref 510390YD3
|
5.000% | 2026-Dec | 105.925 - 105.925 | 105.955 - 105.955 | 2.913 - 2.913 | 2 | $100,000 | 0.03 |
Lane Cmnty College Ore Ser A 515182EP4
|
5.000% | 2029-Jun | 109.027 - 109.027 | 109.097 - 109.097 | 3.195 - 3.195 | 3 | $30,000 | 0.07 |
Lane Cmnty College Ore Ser A 515182EX7
|
4.000% | 2037-Jun | 101.350 - 101.350 | - | - | 1 | $25,000 | |
Lane Cmnty College Ore Ser A 515182FA6
|
4.000% | 2040-Jun | 99.480 - 99.480 | 99.555 - 99.555 | 4.037 - 4.037 | 2 | $480,000 | 0.075 |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300QQ7
|
5.000% | 2024-Jun | 100.770 - 100.770 | 100.776 - 100.776 | 3.531 - 3.531 | 2 | $300,000 | 0.006 |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300QR5
|
5.000% | 2025-Jun | - | 100.893 - 100.893 | 3.312 - 3.312 | 2 | $90,000 | |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300SC6
|
5.000% | 2031-Jun | 105.575 - 105.575 | - | - | 2 | $190,000 | |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300SN2
|
5.000% | 2027-Jun | 107.045 - 107.045 | - | - | 1 | $250,000 | |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300SR3
|
5.000% | 2030-Jun | - | - | - | 1 | $60,000 | |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300ST9
|
4.000% | 2032-Jun | - | 104.402 - 104.402 | 3.128 - 3.128 | 1 | $50,000 | |
Lane Cnty Ore Sch Dist No 4 J Eugene 515300SW2
|
4.000% | 2035-Jun | 102.542 - 102.542 | 102.742 - 102.742 | 3.452 - 3.452 | 2 | $100,000 | 0.2 |
Lane Cnty Ore Sch Dist No 019 Springfield Ref-taxable 515318NA7
|
1.647% | 2028-Jun | - | 87.913 - 87.913 | 4.630 - 4.630 | 1 | $1,000,000+ | |
Lane Cnty Ore Sch Dist No 32 Mapleton 515345BA3
|
3.000% | 2041-Jun | - | 77.700 - 77.700 | 4.911 - 4.911 | 2 | $50,000 | |
Linn Benton Ore Cmnty College Dist 535769EP4
|
3.000% | 2026-Jun | 97.969 - 97.969 | - | - | 1 | $100,000 | |
Linn Benton Ore Cmnty College Dist 535769FB4
|
5.000% | 2025-Jun | - | 102.680 - 102.680 | 3.200 - 3.200 | 2 | $20,000 | |
Linn Benton Ore Cmnty College Dist 535769FG3
|
5.000% | 2030-Jun | 109.428 - 109.428 | - | - | 3 | $30,000 | |
Linn & Marion Cntys Ore Sch Dist No 129j Santiam Canyon 53577KAV9
|
5.000% | 2039-Jun | 106.011 - 106.011 | 106.211 - 106.211 | 3.747 - 3.747 | 2 | $20,000 | 0.2 |
Marion & Linn Cntys Ore Sch Dist No 29j North Santiam Ref 568555CA2
|
5.000% | 2024-Jun | 100.685 - 100.685 | - | - | 1 | $80,000 | |
Marion & Linn Cntys Ore Sch Dist No 29j North Santiam Ref 568555CC8
|
5.000% | 2026-Jun | 103.766 - 103.766 | - | - | 1 | $35,000 | |
Marion & Linn Cntys Ore Sch Dist No 29j North Santiam Ref 568555CH7
|
5.000% | 2031-Jun | 114.286 - 114.286 | 114.448 - 114.448 | 2.856 - 2.856 | 3 | $1,095,000 | 0.162 |
Marion Cnty Ore Sch Dist No 5 Cascade Ref 569134CR8
|
5.000% | 2024-Jun | 100.121 - 100.121 | - | - | 1 | $200,000 | |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203MX7
|
5.000% | 2026-Jun | 104.687 - 104.687 | 105.103 - 105.103 | 2.900 - 2.900 | 3 | $305,000 | 0.416 |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203MY5
|
5.000% | 2027-Jun | 106.620 - 106.620 | 107.150 - 107.150 | 2.861 - 2.861 | 2 | $120,000 | 0.53 |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203MZ2
|
5.000% | 2028-Jun | 108.003 - 108.437 | 108.078 - 108.078 | 3.079 - 3.079 | 3 | $90,000 | 0.075 |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203ND0
|
5.000% | 2032-Jun | 107.046 - 107.046 | 107.296 - 107.296 | 3.257 - 3.257 | 2 | $30,000 | 0.25 |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203NH1
|
5.000% | 2036-Jun | 106.010 - 106.010 | - | - | 2 | $20,000 | |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203NK4
|
5.000% | 2038-Jun | - | 106.200 - 106.243 | 3.500 - 3.510 | 2 | $1,075,000+ | |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer 569203NQ1
|
5.000% | 2035-Jun | 106.660 - 106.660 | - | - | 2 | $30,000 | |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer Conv Defd Int-ser B 569203NX6
|
5.000% | 2025-Jun | 102.486 - 102.486 | - | - | 1 | $200,000 | |
Marion & Polk Cntys Ore Sch Dist No 24j Salem-keizer Ser C 569203PK2
|
4.000% | 2036-Jun | 102.150 - 102.150 | - | - | 1 | $30,000 | |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283GL3
|
5.000% | 2028-Aug | 105.790 - 105.790 | - | - | 2 | $20,000 | |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283GQ2
|
5.000% | 2032-Aug | 107.352 - 107.352 | - | - | 8 | $280,000 | |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283GT6
|
5.000% | 2035-Aug | 106.347 - 106.347 | 106.447 - 106.447 | 3.897 - 3.897 | 2 | $160,000 | 0.1 |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283GW9
|
5.000% | 2037-Aug | - | 106.600 - 106.600 | 3.872 - 3.872 | 1 | $5,000 | |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283GY5
|
4.000% | 2039-Aug | - | 95.274 - 95.274 | 4.420 - 4.420 | 2 | $240,000 | |
Medford Ore Hosp Facs Auth Rev Ref-asante Projs-ser A 584283HB4
|
4.000% | 2045-Aug | 92.340 - 92.340 | - | - | 3 | $75,000 | |
Medford Ore Rev Ref-ltd Tax-ser A 584288DL5
|
5.000% | 2025-Jun | 102.489 - 102.489 | - | - | 1 | $100,000 | |
Metro Ore Ref-full Faith & Credit 59163PJF1
|
3.000% | 2024-Dec | 99.505 - 99.505 | - | - | 2 | $220,000 | |
Metro Ore 59163PJM6
|
5.000% | 2024-Jun | 100.669 - 100.669 | - | - | 2 | $50,000 | |
Metro Ore Taxable 59163PKM4
|
3.000% | 2029-Jun | 91.116 - 91.116 | 91.425 - 91.425 | 4.792 - 4.792 | 4 | $10,160,000+ | 0.309 |
Metro Ore Ser A 59163PLJ0
|
5.000% | 2031-Jun | 111.652 - 112.088 | 112.611 - 112.991 | 2.800 - 2.860 | 6 | $610,000 | 1.339 |
Metro Ore Unrefunded Balance-ser A 59163PLV3
|
4.000% | 2026-Jun | 98.933 - 98.933 | 100.037 - 100.037 | 3.201 - 3.201 | 5 | $80,000 | 1.104 |
Morrow & Gilliam Cntys Ore Sch Dist No 2 Ione Ser A 618887AW3
|
4.000% | 2027-Jun | - | 102.656 - 102.656 | 3.200 - 3.200 | 1 | $10,000 | |
Multnomah-clackamas Cntys Ore Sch Dist No 10jt Gresham- Barlow Defd Int-ser A 625482GE8
|
N/R | 2034-Jun | 62.501 - 62.501 | 62.751 - 62.751 | 4.471 - 4.471 | 3 | $75,000 | 0.25 |
Multnomah-clackamas Cntys Ore Sch Dist No 10jt Gresham- Barlow Ser B 625482HG2
|
5.000% | 2025-Jun | 102.660 - 102.660 | 102.675 - 102.675 | 3.207 - 3.207 | 2 | $100,000 | 0.015 |
Multnomah Cnty Ore 625506PC8
|
5.000% | 2030-Jun | 105.498 - 105.498 | 105.648 - 105.648 | 3.279 - 3.279 | 2 | $20,000 | 0.15 |
Multnomah Cnty Ore 625506PP9
|
4.000% | 2041-Jun | 98.650 - 98.650 | - | - | 1 | $25,000 | |
Multnomah Cnty Ore Ser A 625506QG8
|
5.000% | 2027-Jun | 107.255 - 107.466 | 107.397 - 107.571 | 2.740 - 2.790 | 4 | $3,060,000+ | 0.316 |
Multnomah Cnty Ore Ser A 625506QH6
|
5.000% | 2028-Jun | 108.750 - 108.750 | 109.002 - 109.002 | 2.870 - 2.870 | 3 | $45,000 | 0.252 |
Multnomah Cnty Ore Ser A 625506QJ2
|
5.000% | 2029-Jun | 110.765 - 110.765 | - | - | 1 | $35,000 | |
Multnomah Cnty Ore Taxable-ser B 625506QN3
|
0.500% | 2025-Jun | - | 93.460 - 93.460 | 4.967 - 4.967 | 2 | $50,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Ser B 625517EP8
|
5.000% | 2025-Jun | 102.061 - 102.061 | - | - | 2 | $20,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Portland Pub Schs-ser B 625517JV0
|
5.000% | 2026-Jun | 104.150 - 104.150 | - | - | 2 | $30,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Portland Pub Schs-ser B 625517KG1
|
3.000% | 2037-Jun | 81.322 - 84.375 | 84.545 - 84.545 | 4.541 - 4.541 | 5 | $130,000 | 3.223 |
Multnomah Cnty Ore Sch Dist No 1j Portland 625517KS5
|
5.000% | 2024-Jun | 100.787 - 100.787 | - | - | 1 | $60,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland 625517KU0
|
5.000% | 2026-Jun | 104.710 - 104.710 | 105.020 - 105.020 | 2.933 - 2.933 | 2 | $230,000 | 0.31 |
Multnomah Cnty Ore Sch Dist No 1j Portland 625517KV8
|
5.000% | 2027-Jun | 107.309 - 107.309 | - | - | 1 | $685,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland 625517KZ9
|
5.000% | 2031-Jun | 112.140 - 112.140 | - | - | 1 | $140,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland 625517LA3
|
5.000% | 2032-Jun | 111.398 - 111.398 | 111.498 - 111.498 | 3.047 - 3.047 | 2 | $10,000 | 0.1 |
Multnomah Cnty Ore Sch Dist No 1j Portland Ser B 625517LM7
|
5.000% | 2031-Jun | - | 112.806 - 112.806 | 2.840 - 2.840 | 3 | $245,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Ser B 625517LR6
|
3.000% | 2035-Jun | 87.543 - 87.543 | - | - | 2 | $20,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Bidding Group 1 625517NM5
|
5.000% | 2024-Jun | 100.889 - 100.889 | 100.892 - 100.892 | 3.322 - 3.322 | 2 | $1,470,000 | 0.003 |
Multnomah Cnty Ore Sch Dist No 1j Portland Bidding Group 1 625517NN3
|
5.000% | 2025-Jun | - | 102.680 - 102.680 | 3.200 - 3.200 | 1 | $160,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Bidding Group 1 625517NW3
|
5.000% | 2033-Jun | - | 116.753 - 116.753 | 2.970 - 2.970 | 2 | $10,000 | |
Multnomah Cnty Ore Sch Dist No 1j Portland Bidding Group 2 625517PB7
|
5.000% | 2038-Jun | 112.418 - 112.418 | 112.618 - 112.618 | 3.437 - 3.437 | 2 | $30,000 | 0.2 |
Multnomah Cnty Ore Sch Dist No 007 Reynolds Ref 625574PV4
|
4.000% | 2031-Jun | - | 104.990 - 104.990 | 3.145 - 3.145 | 1 | $25,000 | |
Multnomah Cnty Ore Sch Dist No 040 Ser A 625693JN7
|
N/R | 2051-Jun | 24.584 - 24.584 | 25.114 - 25.114 | 4.668 - 4.668 | 6 | $480,000 | 0.53 |
Northwest Regl Ed Svc Dist Ore Full Faith & Cr Obligs 667785DY2
|
5.000% | 2038-Jun | - | 110.502 - 110.502 | 3.680 - 3.680 | 3 | $120,000 | |
Oregon Cmnty College Dists Taxable-pension Oblig 68583RDE9
|
1.793% | 2030-Jun | - | 80.146 - 80.146 | 5.420 - 5.420 | 1 | $50,000 | |
Oregon Health Sciences Univ Rev Ser B 685869EL9
|
5.000% | 2033-Jul | - | 103.571 - 103.571 | 3.540 - 3.540 | 3 | $180,000 | |
Oregon Health Sciences Univ Rev Ser B 685869EM7
|
5.000% | 2034-Jul | - | 103.250 - 103.250 | 3.669 - 3.669 | 1 | $25,000 | |
Oregon Health Sciences Univ Rev Ser B 685869EN5
|
5.000% | 2039-Jul | 102.082 - 102.082 | - | - | 1 | $50,000 | |
Oregon Health Sciences Univ Rev Ser B 685869EP0
|
5.000% | 2035-Jul | 101.835 - 101.835 | - | - | 2 | $30,000 | |
Oregon Health Sciences Univ Rev Ser B 685869EQ8
|
5.000% | 2036-Jul | 100.918 - 100.918 | - | - | 3 | $15,000 | |
Oregon Health Sciences Univ Rev Ser B 685869ET2
|
4.000% | 2028-Jul | 100.460 - 100.460 | - | - | 2 | $20,000 | |
Oregon Health Sciences Univ Rev Ser A 685869GC7
|
5.000% | 2025-Jul | 102.494 - 102.494 | 102.505 - 102.505 | 3.360 - 3.360 | 2 | $500,000 | 0.011 |
Oregon Health Sciences Univ Rev Ser A 685869GD5
|
5.000% | 2026-Jul | 103.160 - 103.160 | - | - | 2 | $20,000 | |
Oregon Health Sciences Univ Rev Ser A 685869GE3
|
5.000% | 2027-Jul | 105.835 - 105.890 | - | - | 4 | $135,000 | |
Oregon Health Sciences Univ Rev Ser A 685869GG8
|
5.000% | 2029-Jul | 107.030 - 108.690 | - | - | 4 | $40,000 | |
Oregon Health Sciences Univ Rev Ser A 685869GH6
|
5.000% | 2030-Jul | 108.922 - 108.922 | 109.586 - 109.586 | 3.250 - 3.250 | 2 | $25,000 | 0.664 |
Oregon Health Sciences Univ Rev Ser A-green Bds 685869GZ6
|
5.000% | 2037-Jul | 109.153 - 109.153 | 110.820 - 110.820 | 3.454 - 3.454 | 3 | $125,000 | 1.667 |
Oregon Health Sciences Univ Rev Ser A-green Bds 685869HD4
|
4.000% | 2041-Jul | 97.550 - 97.550 | 99.290 - 99.290 | 4.057 - 4.057 | 2 | $200,000 | 1.74 |
Oregon Health Sciences Univ Rev Ser B-1 685869HH5
|
5.000% | 2046-Jul | - | - | - | 1 | $70,000 | |
Oregon Ed Dists Full Faith & Cr Pension Obligs Taxable-ser A 68587FAX2
|
1.360% | 2027-Jun | 87.740 - 87.740 | - | - | 1 | $145,000 | |
Oregon Ed Dists Full Faith & Cr Pension Obligs Taxable-ser A 68587FAY0
|
1.530% | 2028-Jun | - | 85.578 - 85.578 | 5.100 - 5.100 | 2 | $570,000 | |
Oregon Sch Brds Assn Taxable-pension-ser B 686053CQ0
|
5.450% | 2024-Jun | 99.512 - 99.512 | 100.060 - 100.060 | 5.335 - 5.335 | 5 | $25,000 | 0.548 |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DRN7
|
5.000% | 2024-Nov | - | 101.631 - 101.631 | 3.251 - 3.251 | 1 | $20,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DRU1
|
5.000% | 2030-Nov | 101.450 - 101.450 | - | - | 1 | $45,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DRV9
|
4.000% | 2031-Nov | 100.635 - 100.635 | 100.708 - 100.708 | 3.240 - 3.240 | 2 | $300,000 | 0.073 |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DSD8
|
5.000% | 2026-Nov | 101.420 - 101.420 | - | - | 1 | $100,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DSH9
|
5.000% | 2030-Nov | 101.198 - 101.474 | 101.264 - 101.885 | 2.983 - 3.640 | 10 | $1,230,000 | 0.687 |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser A 68607DSJ5
|
5.000% | 2031-Nov | 101.450 - 101.450 | - | - | 1 | $50,000 | |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DSU0
|
5.000% | 2024-Nov | 101.420 - 101.420 | - | - | 2 | $40,000 | |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DSV8
|
5.000% | 2025-Nov | 103.877 - 103.877 | 103.866 - 103.866 | 2.950 - 2.950 | 2 | $1,710,000+ | -0.011 |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DSX4
|
5.000% | 2027-Nov | - | 106.652 - 107.299 | 2.770 - 2.960 | 3 | $1,305,000+ | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sr Lien-ser C 68607DTQ8
|
5.000% | 2026-Nov | - | 105.036 - 105.036 | 3.200 - 3.200 | 2 | $40,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sub Lien-ser A 68607DUM5
|
5.000% | 2039-Nov | - | 109.624 - 109.624 | 3.211 - 3.211 | 2 | $50,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-sub Lien-ser A 68607DUN3
|
5.000% | 2042-Nov | 106.659 - 106.723 | 107.159 - 107.994 | 3.501 - 3.651 | 7 | $355,000 | 1.335 |
Oregon St Dept Transn Hwy User Tax Rev Ref-sub Lien-ser A 68607DUP8
|
4.000% | 2042-Nov | 97.878 - 97.878 | - | - | 3 | $450,000 | |
Oregon St Dept Transn Hwy User Tax Rev Sub Lien-ser A 68607DUQ6
|
5.000% | 2035-Nov | 111.287 - 111.287 | - | - | 4 | $770,000 | |
Oregon St Dept Transn Hwy User Tax Rev Sub Lien-ser A 68607DUR4
|
5.000% | 2036-Nov | 109.785 - 110.070 | 109.935 - 110.096 | 3.360 - 3.385 | 5 | $90,000 | 0.311 |
Oregon St Dept Transn Hwy User Tax Rev Sub Lien-ser A 68607DUU7
|
5.000% | 2039-Nov | 108.026 - 108.026 | - | - | 1 | $30,000 | |
Oregon St Dept Transn Hwy User Tax Rev Ref-taxable-sr Lien-ser B 68607DVC6
|
0.934% | 2026-Nov | - | 89.540 - 89.540 | 4.770 - 4.770 | 1 | $50,000 | |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DVZ5
|
5.000% | 2035-Nov | 114.657 - 114.657 | 115.858 - 115.858 | 2.970 - 2.970 | 4 | $400,000 | 1.201 |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DWB7
|
5.000% | 2037-Nov | 113.061 - 113.061 | 114.085 - 114.085 | 3.180 - 3.180 | 2 | $740,000 | 1.024 |
Oregon St Dept Transn Hwy User Tax Rev Sr Lien-ser A 68607DWG6
|
5.000% | 2042-Nov | 108.554 - 108.554 | 108.954 - 108.954 | 3.810 - 3.810 | 3 | $15,000 | 0.4 |
Oregon St Dept Transn Hwy User Tax Rev Sub Lien-ser A 68607DWQ4
|
5.000% | 2041-Nov | 108.400 - 108.400 | - | - | 2 | $10,000 | |
Oregon St Bd Bk Rev Ore Business Dev Dept-ser A 68607KE88
|
5.000% | 2030-Jan | - | 104.786 - 104.786 | 2.623 - 2.623 | 2 | $40,000 | |
Oregon St Bd Bk Rev Ref-ore Business Dev Dept 68607KG86
|
5.000% | 2027-Jan | 105.797 - 105.797 | - | - | 1 | $100,000 | |
Oregon St Bd Bk Rev Ref-ore Business Dev Dept 68607KH44
|
5.000% | 2031-Jan | 111.610 - 111.610 | 111.910 - 112.810 | 2.980 - 3.113 | 3 | $35,000 | 1.2 |
Oregon St Bd Bk Rev Ref-ore Business Dev Dept 68607KJ75
|
3.000% | 2046-Jan | - | - | - | 1 | $20,000 | |
Oregon St Taxable-pension 68607LXQ5
|
5.892% | 2027-Jun | - | 102.111 - 102.125 | 5.220 - 5.224 | 4 | $310,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser A 68607V2L8
|
5.000% | 2031-Apr | - | 112.164 - 112.164 | 3.130 - 3.130 | 2 | $30,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V3C7
|
5.000% | 2039-Apr | 109.750 - 109.897 | - | - | 2 | $335,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V3F0
|
5.000% | 2042-Apr | 107.150 - 107.150 | - | - | 2 | $10,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V3X1
|
5.000% | 2034-Apr | 116.525 - 116.525 | 116.600 - 116.600 | 2.952 - 2.952 | 2 | $840,000 | 0.075 |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V3Y9
|
5.000% | 2035-Apr | 114.600 - 114.600 | - | - | 2 | $90,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V3Z6
|
5.000% | 2036-Apr | 113.645 - 113.645 | 113.015 - 113.015 | 3.363 - 3.363 | 2 | $50,000 | -0.63 |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607V4D4
|
5.000% | 2040-Apr | - | 111.457 - 111.457 | 3.547 - 3.547 | 3 | $30,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser C 68607VJ30
|
5.000% | 2024-Apr | - | 100.434 - 100.434 | 3.652 - 3.652 | 1 | $10,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser C 68607VJ48
|
5.000% | 2025-Apr | 100.604 - 100.604 | 100.718 - 100.718 | 2.803 - 2.803 | 3 | $2,025,000+ | 0.114 |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VL86
|
5.000% | 2035-Apr | - | 102.024 - 102.177 | 3.314 - 3.430 | 4 | $510,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser C 68607VM93
|
5.000% | 2024-Apr | 100.451 - 100.451 | 100.454 - 100.454 | 3.592 - 3.592 | 2 | $500,000 | 0.003 |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser D 68607VN76
|
5.000% | 2026-Apr | 102.200 - 102.200 | 102.234 - 102.234 | 3.271 - 3.271 | 2 | $55,000 | 0.034 |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser E 68607VP90
|
5.000% | 2027-Apr | 101.610 - 101.610 | - | - | 1 | $10,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ref-ser F 68607VQ65
|
5.000% | 2024-Apr | 100.360 - 100.360 | 100.371 - 100.371 | 3.841 - 3.841 | 2 | $80,000 | 0.011 |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VU52
|
5.000% | 2032-Apr | - | 105.806 - 105.806 | 3.150 - 3.150 | 3 | $450,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VU60
|
5.000% | 2033-Apr | 104.910 - 104.910 | - | - | 1 | $30,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VU94
|
5.000% | 2036-Apr | 104.538 - 104.538 | - | - | 1 | $630,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VV28
|
5.000% | 2037-Apr | - | 104.510 - 104.510 | 3.552 - 3.552 | 2 | $50,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VY25
|
5.000% | 2031-Apr | 111.131 - 111.131 | 108.654 - 111.191 | 2.730 - 3.220 | 4 | $500,000 | 0.06 |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VY58
|
5.000% | 2034-Apr | - | 109.013 - 109.013 | 3.150 - 3.150 | 2 | $220,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VY66
|
5.000% | 2035-Apr | - | 109.013 - 109.013 | 3.150 - 3.150 | 1 | $20,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VY74
|
5.000% | 2036-Apr | - | 108.910 - 108.910 | 3.170 - 3.170 | 1 | $175,000 | |
Oregon St Dept Administrative Svcs Lottery Rev Ser A 68607VZ24
|
5.000% | 2039-Apr | 106.225 - 106.225 | - | - | 1 | $130,000 | |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single-family Mtg Prog-ser D 686087B48
|
3.550% | 2030-Jul | - | 97.605 - 97.605 | 3.967 - 3.967 | 3 | $45,000 | |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Var-single-family Mtg Prog 686087B71
|
3.680% | 2043-Jul | 100.000 - 100.000 | 100.000 - 100.000 | - | 4 | $950,000 | 0 |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Var-single Family Mtg Prog 686087H75
|
3.680% | 2037-Jul | - | 100.000 - 100.000 | - | 2 | $300,000 | |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single Family Mtg-ser A 686087QK6
|
3.875% | 2033-Jan | 97.750 - 97.750 | - | - | 3 | $375,000 | |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single Family Mtg Prog-ser D 686087VV6
|
3.450% | 2038-Jan | 89.250 - 89.250 | - | - | 2 | $10,000 | |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single-family Mtg Prog-ser H 686087XF9
|
2.650% | 2027-Jan | 94.589 - 94.589 | 94.589 - 94.589 | 4.550 - 4.550 | 2 | $40,000 | 0 |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single-family Mtg Prog-ser H 686087XH5
|
2.750% | 2028-Jan | 93.394 - 93.394 | 93.394 - 95.825 | 3.865 - 4.540 | 4 | $480,000 | 2.431 |
Oregon St Hsg & Cmnty Svcs Dept Mtg Rev Single-family Mtg Prog-ser D 686087ZZ3
|
2.800% | 2025-Jan | 98.037 - 98.037 | 98.369 - 98.369 | 4.352 - 4.352 | 2 | $30,000 | 0.332 |
Oregon St Hsg & Cmnty Svcs Dept Hsg Dev Rev Tower At Station Pl Pj-ser A 68608AAJ9
|
4.750% | 2036-Aug | 98.257 - 98.257 | 100.000 - 100.000 | 4.658 - 4.658 | 2 | $20,000 | 1.743 |
Oregon St Loc Govts Ltd Tax-pension Oblig-ser B 68608DCC6
|
6.600% | 2025-Jun | 99.500 - 99.500 | - | - | 1 | $25,000 | |
Oregon St Hsg & Cmnty Svcs Dept Multifamily Rev Hsg-plaza Los Amigos Apts 68608ENB4
|
3.000% | 2026-Feb | 97.800 - 97.800 | 98.000 - 98.000 | - | 2 | $30,000 | 0.2 |
Oregon St Facs Auth Rev Providence Health & Svcs-ser C 68608JPT2
|
4.000% | 2026-Oct | - | 99.957 - 99.957 | 4.015 - 4.015 | 2 | $20,000 | |
Oregon St Facs Auth Rev Ref-peacehealth Proj-ser A 68608JRV5
|
5.000% | 2024-Nov | - | 100.395 - 100.395 | 4.108 - 4.108 | 3 | $45,000 | |
Oregon St Facs Auth Rev Ref-willamette Univ Pjs-ser B 68608JTZ4
|
3.000% | 2045-Oct | - | - | - | 1 | $45,000 | |
Oregon St Facs Auth Rev Legacy Health Proj-ser A 68608JVA6
|
5.000% | 2024-Jun | 100.217 - 100.217 | 100.623 - 100.623 | 3.731 - 3.731 | 2 | $185,000 | 0.406 |
Oregon St Facs Auth Rev Legacy Health Proj-ser A 68608JVB4
|
5.000% | 2025-Jun | 101.000 - 101.000 | 101.580 - 101.580 | 3.905 - 3.905 | 6 | $60,000 | 0.58 |
Oregon St Facs Auth Rev Legacy Health Proj-ser A 68608JVK4
|
5.000% | 2033-Jun | 101.629 - 101.629 | - | - | 1 | $60,000 | |
Oregon St Facs Auth Rev Legacy Health Proj-ser A 68608JVR9
|
5.000% | 2046-Jun | - | 100.069 - 102.172 | 4.077 - 4.970 | 18 | $850,000 | |
Oregon St Facs Auth Rev Reed College Proj-ser A 68608JXC0
|
5.000% | 2047-Jul | - | 106.569 - 106.569 | 3.050 - 3.050 | 2 | $50,000 | |
Oregon St Facs Auth Rev Var-ref-peacehealth-ser A 68608JXD8
|
3.000% | 2034-Aug | - | 100.000 - 100.000 | - | 1 | $0 | |
Oregon St Facs Auth Rev Var-ref-peacehealth-ser B 68608JXF3
|
3.000% | 2034-Aug | 100.000 - 100.000 | 100.000 - 100.000 | - | 5 | $6,300,000+ | 0 |
Oregon St Ref-higher Ed-ser A 68608U2P0
|
5.000% | 2026-Aug | 102.342 - 102.342 | - | - | 2 | $40,000 | |
Oregon St Ser A 68608UH82
|
4.000% | 2024-May | 100.022 - 100.022 | 100.246 - 100.246 | 3.390 - 3.390 | 2 | $20,000 | 0.224 |
Oregon St Higher Ed-ser C 68608UN77
|
5.000% | 2028-Aug | 100.843 - 100.843 | - | - | 1 | $50,000 | |
Oregon St Dept Administrative Svcs Ctfs Partn Taxable-elliott St Fst-ser A 68608VEA8
|
3.636% | 2030-May | 92.339 - 92.339 | - | - | 1 | $3,830,000+ | |
Oregon St Higher Ed-ser G 68609B7N1
|
5.000% | 2028-Aug | 108.986 - 108.986 | 109.046 - 109.046 | 2.912 - 2.912 | 2 | $50,000 | 0.06 |
Oregon St Higher Ed-ser G 68609B7S0
|
5.000% | 2032-Aug | 109.180 - 109.180 | 109.420 - 109.420 | 3.170 - 3.170 | 2 | $50,000 | 0.24 |
Oregon St Article Xi-m Seismic Projs- 68609BA56
|
5.000% | 2035-Jun | - | 105.915 - 105.915 | 3.200 - 3.200 | 1 | $100,000 | |
Oregon St Ref-article Xi-j Alternate 68609BE29
|
5.000% | 2024-Apr | 100.071 - 100.071 | 100.146 - 100.146 | 4.518 - 4.518 | 4 | $120,000 | 0.075 |
Oregon St Ref-article Xi-j Alternate 68609BE52
|
5.000% | 2027-Apr | - | 106.855 - 106.855 | 2.829 - 2.829 | 3 | $120,000 | |
Oregon St Ref-article Xi-q-st Projs 68609BHQ3
|
5.000% | 2026-May | - | 102.160 - 102.160 | 3.423 - 3.423 | 1 | $10,000 | |
Oregon St Ref-article Xi-g-cmnty College 68609BLA3
|
4.000% | 2034-Aug | 99.089 - 99.089 | - | - | 3 | $60,000 | |
Oregon St Article Xi-g-ser O 68609BNF0
|
5.000% | 2030-Aug | 102.792 - 102.792 | - | - | 1 | $105,000 | |
Oregon St Article Xi-g-ohsu Proj-ser H 68609BP50
|
5.000% | 2035-Aug | 104.128 - 104.128 | - | - | 3 | $15,000 | |
Oregon St Higher Ed-ser I 68609BQ91
|
5.000% | 2026-Aug | - | 104.692 - 104.692 | 3.150 - 3.150 | 2 | $20,000 | |
Oregon St Aricle X-f 1-ser A 68609BQK6
|
5.000% | 2041-Aug | 102.551 - 102.551 | 103.282 - 103.782 | 3.500 - 3.694 | 5 | $665,000 | 1.231 |
Oregon St Higher Ed-article Xi-g-ser C 68609BQW0
|
5.000% | 2027-Aug | 104.280 - 104.280 | - | - | 1 | $50,000 | |
Oregon St Higher Ed-ser I 68609BR25
|
5.000% | 2027-Aug | - | 107.251 - 107.431 | 2.850 - 2.900 | 3 | $250,000 | |
Oregon St Higher Ed-ser I 68609BR90
|
4.000% | 2034-Aug | 102.079 - 102.079 | 104.504 - 104.504 | 2.701 - 2.701 | 3 | $45,000 | 2.425 |
Oregon St Higher Ed-article Xi-g-ser C 68609BRG4
|
5.000% | 2041-Aug | - | 103.180 - 103.180 | 3.734 - 3.734 | 2 | $50,000 | |
Oregon St Article Xi-q-st Projs-ser D 68609BRQ2
|
3.000% | 2024-May | 99.640 - 99.640 | - | - | 1 | $50,000 | |
Oregon St Ref-article Xi-q-st Projs-f 68609BSM0
|
5.000% | 2028-May | 104.369 - 104.369 | 104.246 - 104.393 | 3.098 - 3.160 | 3 | $90,000 | 0.024 |
Oregon St Ref-article Xi-q-st Projs-f 68609BSQ1
|
5.000% | 2031-May | 103.609 - 103.609 | 103.980 - 103.980 | 3.272 - 3.272 | 3 | $240,000 | 0.371 |
Oregon St Higher Ed-ser J 68609BT80
|
4.000% | 2029-Aug | 101.830 - 101.830 | - | - | 1 | $10,000 | |
Oregon St Higher Ed-ser L 68609BW37
|
5.000% | 2027-Aug | 106.567 - 106.567 | - | - | 1 | $10,000 | |
Oregon St Higher Ed-ser L 68609BW52
|
5.000% | 2029-Aug | - | 106.883 - 106.883 | 3.002 - 3.002 | 2 | $30,000 | |
Oregon St Higher Ed-ser L 68609BW86
|
5.000% | 2032-Aug | - | 108.290 - 108.290 | 2.613 - 2.613 | 3 | $45,000 | |
Oregon St Odot Projs-ser M 68609BY84
|
5.000% | 2026-Nov | - | - | - | 1 | $100,000 | |
Oregon St Article Xi-q St Projs-ser A 68609BYX9
|
5.000% | 2026-May | 104.717 - 104.717 | - | - | 1 | $175,000 | |
Oregon St Article Xi-q St Projs-ser A 68609BYZ4
|
5.000% | 2028-May | 105.826 - 105.826 | 106.781 - 106.781 | 2.900 - 2.900 | 4 | $615,000 | 0.955 |
Oregon St Odot Projs-ser M 68609BZ91
|
5.000% | 2035-Nov | - | 105.223 - 105.223 | 3.385 - 3.385 | 2 | $410,000 | |
Oregon St Article Xi-q St Projs-ser A 68609BZC4
|
5.000% | 2031-May | - | 105.900 - 105.900 | 3.164 - 3.164 | 2 | $100,000 | |
Oregon St Article Xi-m Seismic Projs- 68609BZU4
|
5.000% | 2026-Jun | 104.010 - 104.010 | - | - | 2 | $60,000 | |
Oregon St Higher Ed-article Xf-1-ser H 68609T2E7
|
4.000% | 2034-Aug | 103.265 - 103.265 | - | - | 2 | $40,000 | |
Oregon St Article Xi-q St Projs-ser A 68609T5R5
|
5.000% | 2029-May | - | 110.270 - 110.270 | 2.935 - 2.935 | 2 | $50,000 | |
Oregon St Article Xi-q St Projs-ser A 68609T5W4
|
5.000% | 2034-May | - | 115.451 - 115.451 | 2.916 - 2.916 | 1 | $15,000 | |
Oregon St Article Xi-q St Projs-ser A 68609T6A1
|
5.000% | 2038-May | 110.170 - 110.170 | - | - | 2 | $110,000 | |
Oregon St Ser A 68609TD21
|
5.000% | 2024-May | 100.769 - 100.769 | - | - | 1 | $450,000 | |
Oregon St Ser A 68609TD54
|
5.000% | 2027-May | - | 106.279 - 106.279 | 3.050 - 3.050 | 1 | $10,000 | |
Oregon St Ser A 68609TD96
|
5.000% | 2031-May | 113.625 - 113.625 | 113.696 - 113.696 | 2.932 - 2.932 | 2 | $70,000 | 0.071 |
Oregon St Vets Welfare-ser 101-ser V 68609TDH8
|
2.200% | 2024-Jun | 98.010 - 98.010 | 98.823 - 98.823 | 4.608 - 4.608 | 4 | $200,000 | 0.813 |
Oregon St Ser A 68609TE46
|
5.000% | 2034-May | 112.825 - 112.825 | - | - | 1 | $55,000 | |
Oregon St Ser A 68609TE61
|
5.000% | 2036-May | 111.012 - 111.210 | 111.012 - 111.012 | 3.313 - 3.313 | 5 | $50,000 | 0 |
Oregon St Ser A 68609TF29
|
4.000% | 2040-May | - | 100.636 - 100.636 | 3.900 - 3.900 | 2 | $40,000 | |
Oregon St Ser C 68609TFH6
|
5.000% | 2024-Jun | 100.697 - 100.697 | - | - | 2 | $100,000 | |
Oregon St Ser C 68609TFQ6
|
5.000% | 2031-Jun | - | 107.531 - 107.531 | 3.190 - 3.190 | 2 | $20,000 | |
Oregon St Ser D 68609TH43
|
4.000% | 2037-Jun | - | 104.205 - 104.205 | 3.361 - 3.361 | 2 | $50,000 | |
Oregon St Taxable-article Xi-q-st Projs 68609TJL3
|
3.871% | 2039-May | - | - | - | 1 | $1,500,000+ | |
Oregon St Article Xi-p Sch Dist Grant 68609TK64
|
5.000% | 2035-Jun | 113.143 - 113.143 | 113.343 - 113.343 | 3.000 - 3.000 | 2 | $20,000 | 0.2 |
Oregon St Articles Xi-m Xi-n Xi-p 68609TKG2
|
5.000% | 2029-Jun | - | 109.858 - 109.858 | 3.040 - 3.040 | 1 | $25,000 | |
Oregon St Articles Xi-m Xi-n Xi-p 68609TKJ6
|
5.000% | 2031-Jun | 110.557 - 110.557 | 111.057 - 111.057 | 2.816 - 2.816 | 2 | $30,000 | 0.5 |
Oregon St Articles Xi-m Xi-n Xi-p 68609TKK3
|
5.000% | 2032-Jun | 110.291 - 110.291 | 110.441 - 110.441 | 2.931 - 2.931 | 2 | $40,000 | 0.15 |
Oregon St Taxable-article Xi-q-st Projs 68609TL71
|
0.434% | 2024-May | - | 98.000 - 98.000 | 5.339 - 5.339 | 1 | $40,000 | |
Oregon St Article Xi-q-st Projs-ser A 68609TLD8
|
5.000% | 2030-May | 110.281 - 110.281 | 110.333 - 110.333 | 2.923 - 2.923 | 2 | $410,000 | 0.052 |
Oregon St Article Xi-q-st Projs-ser A 68609TLH9
|
5.000% | 2034-May | 109.000 - 109.000 | - | - | 2 | $20,000 | |
Oregon St Taxable-article Xi Q-st Projs 68609TN79
|
0.874% | 2025-May | - | 94.334 - 94.334 | 5.069 - 5.069 | 3 | $870,000 | |
Oregon St Article Xi-q-st Projs-ser N 68609TQP6
|
5.000% | 2029-May | 110.865 - 110.865 | - | - | 4 | $485,000 | |
Oregon St Article Xi-q-st Projs-ser N 68609TQQ4
|
5.000% | 2030-May | 110.800 - 110.800 | - | - | 1 | $75,000 | |
Oregon St Article Xi-q-st Projs-ser N 68609TQT8
|
5.000% | 2033-May | 109.540 - 109.540 | - | - | 2 | $20,000 | |
Oregon St Article Xi-q-st Projs-ser N 68609TQU5
|
5.000% | 2034-May | - | 109.742 - 109.742 | 3.180 - 3.180 | 1 | $20,000 | |
Oregon St Article Xi-q-st Projs-ser N 68609TQV3
|
5.000% | 2035-May | - | 110.367 - 110.367 | 3.070 - 3.070 | 1 | $170,000 | |
Oregon St Taxable-higher Ed-article Xi-f 68609TT81
|
0.803% | 2025-Aug | - | 92.809 - 92.809 | 5.370 - 5.370 | 1 | $45,000 | |
Oregon St Article Xi-m & Xi-n Seismic 68609TUD8
|
5.000% | 2030-Jun | - | 111.356 - 111.356 | 3.060 - 3.060 | 2 | $20,000 | |
Oregon St Article Xi-m & Xi-n Seismic 68609TUN6
|
5.000% | 2039-Jun | - | 108.167 - 108.167 | 3.580 - 3.580 | 2 | $10,000 | |
Oregon St Higher Ed-article Xi-g-ser F 68609TX52
|
5.000% | 2034-Aug | - | 113.091 - 113.091 | 3.070 - 3.070 | 1 | $10,000 | |
Oregon St Ref-veterans Welfare-ser 105a 68609TXU7
|
1.600% | 2027-Dec | - | 89.233 - 89.489 | 4.501 - 4.576 | 9 | $275,000 | |
Oregon St Higher Ed-article Xi-g-ser F 68609TY44
|
5.000% | 2041-Aug | 107.970 - 107.970 | - | - | 2 | $40,000 | |
Oregon St Ref-higher Ed-ser N 68609TYT9
|
5.000% | 2028-Aug | - | 108.917 - 108.917 | 2.940 - 2.940 | 2 | $100,000 | |
Oregon St Taxable-article Xi-q St Projs 68609UBL8
|
4.397% | 2032-May | 94.570 - 94.570 | - | - | 1 | $15,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UBR5
|
5.000% | 2024-May | 100.769 - 100.769 | - | - | 1 | $100,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UBS3
|
5.000% | 2025-May | 102.241 - 102.241 | - | - | 1 | $10,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UBU8
|
5.000% | 2027-May | 106.308 - 106.308 | - | - | 2 | $70,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UBV6
|
5.000% | 2028-May | 108.372 - 108.700 | 108.772 - 108.772 | 2.871 - 2.871 | 4 | $50,000 | 0.4 |
Oregon St Article Xi-q St Projs-ser A 68609UBW4
|
5.000% | 2029-May | 110.980 - 110.980 | - | - | 1 | $45,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UBZ7
|
5.000% | 2032-May | 114.892 - 114.892 | - | - | 1 | $60,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UCA1
|
5.000% | 2033-May | - | 117.831 - 117.831 | 2.829 - 2.829 | 2 | $80,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UCB9
|
5.000% | 2034-May | 116.829 - 116.829 | 117.129 - 117.129 | 2.907 - 2.907 | 2 | $60,000 | 0.3 |
Oregon St Article Xi-q St Projs-ser A 68609UCE3
|
5.000% | 2037-May | - | 112.969 - 112.969 | 3.380 - 3.380 | 2 | $180,000 | |
Oregon St Article Xi-q St Projs-ser A 68609UCJ2
|
5.000% | 2041-May | 110.635 - 110.635 | 110.935 - 110.935 | 3.619 - 3.619 | 2 | $140,000 | 0.3 |
Oregon St Article Xi-q St Projs-ser A 68609UCP8
|
5.000% | 2048-May | - | 109.173 - 109.173 | 3.830 - 3.830 | 2 | $3,500,000+ | |
Oregon St Article Xi-m-xi-n-xi-p-st Gnt 68609UDD4
|
5.000% | 2037-Jun | 113.367 - 113.367 | - | - | 3 | $315,000 | |
Oregon St Higher Ed-ser G 68609UFN0
|
5.000% | 2025-Aug | 103.073 - 103.073 | - | - | 1 | $640,000 | |
Oregon St Higher Ed-ser G 68609UGD1
|
5.000% | 2040-Aug | 111.166 - 111.166 | - | - | 1 | $90,000 | |
Oregon St Taxable-hgher Ed-ser H 68609UHA6
|
5.152% | 2053-Aug | - | 96.686 - 96.767 | 5.371 - 5.376 | 5 | $400,000 | |
Oregon St Article Xi-q St Projs-ser J 68609UHR9
|
5.000% | 2038-Nov | 112.438 - 112.438 | 112.473 - 112.473 | 3.500 - 3.500 | 2 | $220,000 | 0.035 |
Oregon St Taxable-article Xi-q-st Projs 68609UJG1
|
5.693% | 2033-Nov | - | 104.970 - 104.970 | 5.049 - 5.049 | 3 | $75,000 | |
Pacific Cmntys Health Dist Ore 69413PAK6
|
4.000% | 2026-Jun | 101.020 - 101.020 | - | - | 1 | $50,000 | |
Philomath Ore Ref 718780FB0
|
4.000% | 2025-Apr | - | 100.577 - 100.577 | 3.550 - 3.550 | 2 | $30,000 | |
Phoenix Talent Sch Dist No 004 Ore Ser B 71915PCN7
|
4.000% | 2028-Jun | - | 104.040 - 104.040 | 3.040 - 3.040 | 2 | $20,000 | |
Phoenix Talent Sch Dist No 004 Ore Ser B 71915PCQ0
|
5.000% | 2030-Jun | - | - | - | 1 | $15,000 | |
Polk Cnty Ore Sch Dist No 002 Dallas 731367DX3
|
5.000% | 2024-Jun | 100.695 - 100.695 | - | - | 2 | $90,000 | |
Polk Marion & Benton Cntys Ore Sch Dist No 13j Defd Int-ser B 731418KG3
|
N/R | 2032-Jun | - | 70.812 - 70.812 | 4.083 - 4.083 | 3 | $75,000 | |
Port Morrow Ore Full Faith & Cr Obligs Ref-ser A 73473RDC6
|
4.000% | 2032-Jun | - | 103.297 - 103.297 | 3.339 - 3.339 | 4 | $40,000 | |
Port Morrow Ore Full Faith & Cr Obligs Ref-ser D 73473REZ4
|
4.000% | 2033-Dec | - | 100.530 - 100.530 | 3.900 - 3.900 | 1 | $50,000 | |
Port Morrow Ore Transmission Facs Rev Taxable-bonneville Cooperation 73474TAB6
|
3.221% | 2024-Sep | - | 98.300 - 98.392 | 5.430 - 5.551 | 7 | $550,000 | |
Port Morrow Ore Transmission Facs Rev Taxable-bonneville Coop Proj 73474TAU4
|
2.533% | 2043-Sep | 63.000 - 63.000 | - | - | 1 | $25,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 7352402B8
|
5.000% | 2029-Jul | 106.003 - 106.003 | - | - | 1 | $25,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 7352402C6
|
5.000% | 2030-Jul | 107.289 - 107.289 | - | - | 1 | $160,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 7352402D4
|
5.000% | 2031-Jul | 107.100 - 107.386 | - | - | 4 | $40,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 7352402F9
|
5.000% | 2033-Jul | - | 109.500 - 109.500 | 3.698 - 3.698 | 1 | $40,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 7352402T9
|
5.000% | 2029-Jul | 105.276 - 105.276 | - | - | 2 | $20,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240F57
|
5.000% | 2029-Jul | 99.560 - 99.560 | - | - | 1 | $10,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240G23
|
5.000% | 2034-Jul | 98.280 - 98.280 | - | - | 3 | $15,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240G49
|
5.000% | 2044-Jul | - | 100.300 - 100.300 | 4.467 - 4.467 | 1 | $5,000 | |
Port Portland Ore Arpt Rev Ref-portland Intl Arpt-ser 735240H30
|
5.000% | 2024-Jul | 100.769 - 100.769 | - | - | 2 | $200,000 | |
Port Portland Ore Arpt Rev Ref-portland Intl Arpt-ser 735240J61
|
5.000% | 2035-Jul | - | 102.832 - 102.966 | 3.065 - 3.154 | 6 | $700,000 | |
Port Portland Ore Arpt Rev Ref-portland Intl Arpt-ser 735240J79
|
5.000% | 2038-Jul | 100.860 - 100.860 | - | - | 1 | $25,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240L43
|
5.000% | 2026-Jul | 102.710 - 102.710 | - | - | 1 | $35,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240L84
|
5.000% | 2030-Jul | 102.857 - 102.857 | - | - | 1 | $50,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240P98
|
5.000% | 2034-Jul | 104.076 - 104.076 | - | - | 1 | $10,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240Q22
|
5.000% | 2035-Jul | 103.982 - 104.104 | 104.182 - 104.479 | 4.094 - 4.152 | 6 | $60,000 | 0.497 |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240Q55
|
5.000% | 2038-Jul | 101.820 - 101.820 | - | - | 1 | $200,000 | |
Port Portland Ore Arpt Rev Taxable-portland Intl Arpt 735240R62
|
3.114% | 2025-Jul | 96.005 - 96.005 | 96.105 - 96.181 | 5.668 - 5.720 | 4 | $950,000 | 0.176 |
Port Portland Ore Arpt Rev Taxable-portland Intl Arpt 735240R70
|
3.214% | 2026-Jul | 94.752 - 94.752 | - | - | 1 | $395,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240W41
|
5.000% | 2029-Jul | 106.150 - 106.150 | - | - | 1 | $20,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240W90
|
5.000% | 2034-Jul | - | 106.030 - 106.030 | 3.950 - 3.950 | 2 | $360,000 | |
Port Portland Ore Arpt Rev Taxable-portland Intl Arpt-ser 735240Y56
|
1.200% | 2024-Jul | 97.100 - 97.100 | - | - | 3 | $75,000 | |
Port Portland Ore Arpt Rev Amt-portland Intl Arpt-ser 735240Z97
|
5.000% | 2027-Jul | 103.643 - 103.643 | - | - | 1 | $10,000 | |
Portland Ore Ser A 736679XD8
|
5.000% | 2027-Jun | 106.266 - 106.266 | 106.466 - 106.466 | 3.058 - 3.058 | 3 | $60,000 | 0.2 |
Portland Ore Ser A 736679XJ5
|
3.000% | 2032-Jun | - | 93.633 - 93.633 | 3.883 - 3.883 | 2 | $30,000 | |
Portland Ore Parks Impt Proj-ser A 736679XZ9
|
3.000% | 2027-Jun | - | 99.256 - 99.256 | 3.224 - 3.224 | 2 | $130,000 | |
Portland Ore Ref-pub Safety Projs-ser A 736679ZC8
|
5.000% | 2025-Jun | 102.792 - 102.792 | 102.984 - 102.984 | 3.000 - 3.000 | 2 | $350,000 | 0.192 |
Portland Ore Ref-pub Safety Projs-ser A 736679ZD6
|
5.000% | 2026-Jun | 104.201 - 104.201 | 104.401 - 104.401 | 3.181 - 3.181 | 2 | $20,000 | 0.2 |
Portland Ore Cmnty College Dist Ref 736688KD3
|
5.000% | 2028-Jun | - | 104.250 - 104.250 | 3.242 - 3.242 | 1 | $10,000 | |
Portland Ore Cmnty College Dist 736688KT8
|
5.000% | 2028-Jun | 104.029 - 104.029 | 104.129 - 104.129 | 3.291 - 3.291 | 2 | $70,000 | 0.1 |
Portland Ore Cmnty College Dist 736688MU3
|
5.000% | 2030-Jun | 111.625 - 111.625 | 111.719 - 111.719 | 3.012 - 3.012 | 2 | $100,000 | 0.094 |
Portland Ore Rev Ltd Tax-sellwood Brdg Pj-ser 736740PS4
|
4.000% | 2030-Jun | 99.812 - 99.812 | 100.712 - 100.712 | 2.558 - 2.558 | 4 | $100,000 | 0.9 |
Portland Ore Rev Ref-ltd Tax-sellwood Brdg & 736740QQ7
|
5.000% | 2025-Apr | 100.900 - 100.900 | 101.080 - 101.080 | 4.155 - 4.155 | 4 | $80,000 | 0.18 |
Portland Ore Rev Ref-ltd Tax-sellwood Brdg & 736740QZ7
|
4.000% | 2034-Apr | - | 103.072 - 103.730 | 2.819 - 3.023 | 4 | $750,000 | |
Portland Ore Rev Ref-ltd Tax-4th & Montgomery & 736740UJ8
|
5.000% | 2035-Feb | - | 109.102 - 109.102 | 3.080 - 3.080 | 1 | $650,000 | |
Portland Ore Rev Ref-ltd Tax-oregon Convention 736740US8
|
5.000% | 2025-Jun | 102.562 - 102.952 | - | - | 2 | $245,000 | |
Portland Ore Rev Ref-ltd Tax-oregon Convention 736740UU3
|
5.000% | 2027-Jun | 107.062 - 107.062 | - | - | 1 | $200,000 | |
Portland Ore Rev Ltd Tax-build Portland & Fuel 736740XF3
|
5.000% | 2038-Apr | - | 110.680 - 110.680 | 3.510 - 3.510 | 1 | $10,000 | |
Portland Ore Rev Ltd Tax-build Portland & Fuel 736740XG1
|
5.000% | 2039-Apr | 109.637 - 109.637 | - | - | 2 | $20,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742B30
|
5.000% | 2026-Mar | 103.913 - 103.913 | - | - | 1 | $30,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742B48
|
5.000% | 2027-Mar | 106.030 - 106.072 | - | - | 3 | $140,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742B63
|
5.000% | 2029-Mar | - | 109.541 - 109.541 | 3.020 - 3.020 | 1 | $40,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742B71
|
5.000% | 2030-Mar | 111.004 - 111.004 | 111.094 - 111.094 | 3.037 - 3.037 | 2 | $100,000 | 0.09 |
Portland Ore Swr Sys Rev Second Lien-ser A 736742C47
|
3.000% | 2035-Mar | 88.700 - 88.700 | - | - | 2 | $140,000 | |
Portland Ore Swr Sys Rev Ref-second Lien-ser A 736742F28
|
5.000% | 2032-Dec | - | 117.048 - 117.048 | 2.840 - 2.840 | 2 | $250,000 | |
Portland Ore Swr Sys Rev Ref-second Lien-ser A 736742F36
|
5.000% | 2033-Dec | 115.794 - 116.145 | 116.202 - 116.202 | 3.025 - 3.025 | 4 | $100,000 | 0.408 |
Portland Ore Swr Sys Rev Ref-second Lien-ser A 736742F69
|
5.000% | 2036-Dec | 113.350 - 113.350 | - | - | 1 | $100,000 | |
Portland Ore Swr Sys Rev Second Lien-ser B 736742WC7
|
4.000% | 2037-Oct | 98.763 - 98.763 | 99.659 - 99.659 | 4.032 - 4.032 | 4 | $160,000 | 0.896 |
Portland Ore Swr Sys Rev Ref-first Lien-ser A 736742WN3
|
5.000% | 2025-Jun | 102.290 - 102.290 | - | - | 1 | $20,000 | |
Portland Ore Swr Sys Rev Ref-first Lien-ser A 736742WP8
|
5.000% | 2026-Jun | - | 102.577 - 102.577 | 3.226 - 3.226 | 2 | $30,000 | |
Portland Ore Swr Sys Rev Ref-second Lien-ser B 736742XL6
|
3.000% | 2031-Jun | - | 96.635 - 96.635 | 3.514 - 3.514 | 4 | $20,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742ZF7
|
5.000% | 2027-May | 103.264 - 103.264 | - | - | 4 | $40,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742ZH3
|
4.500% | 2029-May | 102.150 - 102.150 | 102.350 - 102.350 | 3.477 - 3.477 | 2 | $40,000 | 0.2 |
Portland Ore Swr Sys Rev Second Lien-ser A 736742ZK6
|
4.500% | 2031-May | - | 101.992 - 101.992 | 3.630 - 3.630 | 2 | $40,000 | |
Portland Ore Swr Sys Rev Second Lien-ser A 736742ZQ3
|
4.500% | 2036-May | - | 102.922 - 102.922 | 3.232 - 3.232 | 2 | $150,000 | |
Portland Ore Swr Sys Rev Ref-second Lien-ser A 736742ZY6
|
5.000% | 2033-Mar | 110.175 - 110.175 | 110.257 - 110.257 | 3.042 - 3.042 | 2 | $180,000 | 0.082 |
Portland Ore Wtr Sys Rev Ref-second Lien-ser B 736754RP9
|
5.000% | 2032-May | 111.974 - 111.974 | - | - | 1 | $5,000 | |
Portland Ore Wtr Sys Rev Ref-second Lien-ser B 736754RQ7
|
4.000% | 2033-May | 104.942 - 104.942 | 104.974 - 104.974 | 3.240 - 3.240 | 2 | $680,000 | 0.032 |
Portland Ore Wtr Sys Rev Ref-second Lien-ser B 736754RU8
|
3.000% | 2037-May | - | 84.084 - 84.084 | 4.603 - 4.603 | 1 | $50,000 | |
Portland Ore Wtr Sys Rev Ref-first Lien-ser A 736754SS2
|
4.000% | 2035-Apr | 103.654 - 103.654 | 103.854 - 103.854 | 3.434 - 3.434 | 2 | $30,000 | 0.2 |
Redmond Ore Area Pk & Rec Dist 757660AC9
|
5.000% | 2026-Jun | - | 104.237 - 104.237 | 3.247 - 3.247 | 1 | $15,000 | |
Rockwood Ore Wtr Peoples Util Dist Wtr Rev Ref 774459BW0
|
4.000% | 2030-Jun | - | 104.017 - 104.017 | 3.312 - 3.312 | 3 | $30,000 | |
Salem-keizer Ore Sch Dist No 24j Defd Int-ser B 794173FR0
|
N/R | 2025-Jun | 94.370 - 94.370 | - | - | 2 | $20,000 | |
Salem Ore Ref-proj 794454U63
|
5.000% | 2026-Jun | 104.792 - 104.792 | 104.782 - 104.782 | 3.000 - 3.000 | 4 | $375,000 | -0.01 |
Salem Ore Ref-proj 794454V21
|
4.000% | 2030-Jun | - | 102.140 - 102.140 | 3.347 - 3.347 | 3 | $15,000 | |
Salem Ore Ref-proj 794454V70
|
3.000% | 2035-Jun | - | 86.267 - 86.267 | 4.547 - 4.547 | 2 | $20,000 | |
Salem Ore Ref-proj 794454V96
|
3.000% | 2037-Jun | - | 83.593 - 83.593 | 4.650 - 4.650 | 2 | $40,000 | |
Salem Ore Ser B 794454Y93
|
5.000% | 2028-Jun | - | 108.579 - 108.579 | 2.950 - 2.950 | 1 | $30,000 | |
Salem Ore Ser B 794454Z50
|
5.000% | 2032-Jun | 115.828 - 115.828 | - | - | 1 | $150,000 | |
Salem Ore Hosp Fac Auth Rev Ref-salem Health Projs-ser A 794458DV8
|
5.000% | 2025-May | 101.020 - 101.020 | 101.700 - 101.700 | 3.787 - 3.787 | 2 | $25,000 | 0.68 |
Salem Ore Hosp Fac Auth Rev Ref-salem Health Projs-ser A 794458EH8
|
4.000% | 2041-May | 92.877 - 93.140 | 93.112 - 95.074 | 4.407 - 4.577 | 16 | $530,000 | 2.197 |
Salem Ore Hosp Fac Auth Rev Salem Health Projs-ser A 794458FJ3
|
5.000% | 2029-May | - | 106.750 - 106.750 | 3.625 - 3.625 | 1 | $5,000 | |
Salem Ore Hosp Fac Auth Rev Salem Health Projs-ser A 794458FL8
|
5.000% | 2031-May | - | - | - | 1 | $205,000 | |
Salem Ore Hosp Fac Auth Rev Salem Health Projs-ser A 794458FU8
|
5.000% | 2039-May | - | 103.675 - 103.675 | 4.238 - 4.238 | 1 | $125,000 | |
Salem Ore Hosp Fac Auth Rev Salem Health Projs-ser A 794458FW4
|
3.000% | 2049-May | 66.745 - 66.745 | 68.595 - 68.595 | 5.250 - 5.250 | 2 | $10,000 | 1.85 |
Salem Ore Wtr & Swr Rev Ref 794481KB6
|
5.000% | 2024-Jun | 100.707 - 100.716 | - | - | 2 | $180,000 | |
Seal Rock Ore Wtr Dist 812073BV5
|
3.250% | 2030-Jun | 92.468 - 92.468 | - | - | 2 | $40,000 | |
Seaside Ore Transient Lodging Tax Rev 812513AN9
|
5.000% | 2037-Dec | 105.260 - 105.260 | - | - | 1 | $15,000 | |
Sherwood Ore Cr Obligs 824420JC8
|
4.000% | 2029-Jun | - | 104.005 - 104.005 | 3.200 - 3.200 | 1 | $100,000 | |
Southwestern Ore Cmnty College Dist Ref 845680LV7
|
4.000% | 2027-May | 101.199 - 101.199 | 101.564 - 101.564 | 3.320 - 3.320 | 2 | $280,000 | 0.365 |
Southwestern Ore Cmnty College Dist 845680NJ2
|
4.000% | 2034-May | - | 101.950 - 101.950 | 3.600 - 3.600 | 5 | $300,000 | |
Springfield Ore Swr Sys Rev Ref 851326DJ4
|
4.000% | 2024-Apr | 99.692 - 99.692 | - | - | 2 | $30,000 | |
Springfield Ore Swr Sys Rev Ref 851326DK1
|
4.000% | 2025-Apr | 100.551 - 100.551 | - | - | 1 | $20,000 | |
Tillamook & Yamhill Cntys Ore Sch Dist No 101 Nestucca Vy Ser B 886791CG5
|
5.000% | 2030-Jun | - | 108.354 - 108.354 | 3.016 - 3.016 | 1 | $10,000 | |
Tri-cnty Met Transn Dist Ore Rev Ref-sr Lien-payroll Tax-ser A 89546RMU5
|
5.000% | 2029-Sep | 105.082 - 105.082 | - | - | 1 | $75,000 | |
Tri-cnty Met Transn Dist Ore Rev Ref-sr Lien-payroll Tax-ser A 89546RMX9
|
4.000% | 2032-Sep | 102.059 - 102.059 | - | - | 1 | $55,000 | |
Tri-cnty Met Transn Dist Ore Rev Ref-sr Lien-payroll Tax-ser A 89546RNB6
|
5.000% | 2027-Sep | - | 104.832 - 104.832 | 3.150 - 3.150 | 1 | $25,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RNK6
|
5.000% | 2025-Sep | 102.485 - 102.485 | - | - | 2 | $30,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RNL4
|
5.000% | 2026-Sep | - | 104.939 - 104.939 | 3.110 - 3.110 | 1 | $40,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RNP5
|
5.000% | 2029-Sep | - | 105.047 - 105.047 | 3.070 - 3.070 | 2 | $50,000 | |
Tri-cnty Met Transn Dist Ore Rev Cap Grant Rcpt-ser A 89546RPQ1
|
5.000% | 2029-Oct | - | - | - | 1 | $290,000 | |
Tri-cnty Met Transn Dist Ore Rev Cap Grant Rcpt-ser A 89546RPU2
|
4.000% | 2033-Oct | 100.888 - 100.888 | - | - | 1 | $290,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RQG2
|
5.000% | 2029-Sep | - | 106.780 - 106.780 | 3.071 - 3.071 | 1 | $10,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RQV9
|
4.000% | 2048-Sep | 93.555 - 93.555 | 96.380 - 96.380 | 4.237 - 4.237 | 5 | $200,000 | 2.825 |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RRR7
|
5.000% | 2037-Sep | - | 107.476 - 107.476 | 3.550 - 3.550 | 2 | $20,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RRS5
|
5.000% | 2038-Sep | 108.261 - 108.261 | 108.287 - 108.287 | 3.400 - 3.400 | 2 | $1,000,000 | 0.026 |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RRT3
|
4.000% | 2039-Sep | - | 99.520 - 99.520 | 4.041 - 4.041 | 3 | $90,000 | |
Tri-cnty Met Transn Dist Ore Rev Sr Lien-payroll Tax-ser A 89546RSD7
|
5.000% | 2030-Sep | 113.300 - 113.300 | 113.600 - 113.600 | 2.776 - 2.776 | 2 | $60,000 | 0.3 |
Tualatin Hills Ore Pk & Rec Dist Ref 898541LL9
|
4.000% | 2025-Jun | 100.853 - 100.853 | - | - | 1 | $80,000 | |
Tualatin Hills Ore Pk & Rec Dist Ref 898541LM7
|
5.000% | 2026-Jun | 102.121 - 102.121 | - | - | 1 | $25,000 | |
Tualatin Hills Ore Pk & Rec Dist Ref 898541MU8
|
5.000% | 2025-Jun | 102.701 - 102.701 | - | - | 1 | $255,000 | |
Tualatin Ore Ref 898544JR3
|
5.000% | 2025-Jun | 102.426 - 102.426 | - | - | 1 | $140,000 | |
Tualatin Ore Ref 898544JT9
|
5.000% | 2027-Jun | - | 106.735 - 106.735 | 2.980 - 2.980 | 2 | $50,000 | |
Tualatin Valley Ore Fire & Rescue Rural Fire Protn Dist Ref 89855EEX2
|
4.000% | 2027-Mar | 102.723 - 102.723 | - | - | 1 | $25,000 | |
Tualatin Valley Ore Fire & Rescue Rural Fire Protn Dist 89855EFV5
|
5.000% | 2031-Jun | 113.393 - 113.393 | - | - | 1 | $25,000 | |
Umatilla Cnty Ore Sch Dist No 6 R Umatilla Ser A 904115EV0
|
5.000% | 2033-Jun | 115.699 - 115.699 | - | - | 1 | $60,000 | |
Union Cnty Ore Sch Dist No 001 La Grande 906429DM4
|
4.000% | 2026-Jun | 101.522 - 101.522 | - | - | 2 | $2,000,000+ | |
Union Cnty Ore Sch Dist No 001 La Grande 906429DP7
|
4.000% | 2028-Jun | 101.522 - 101.522 | - | - | 2 | $3,180,000+ | |
Union Cnty Ore Sch Dist No 001 La Grande 906429DQ5
|
4.000% | 2029-Jun | 101.522 - 101.522 | - | - | 2 | $2,940,000+ | |
Union Cnty Ore Sch Dist No 001 La Grande 906429DS1
|
5.000% | 2031-Jun | 103.015 - 103.015 | - | - | 2 | $4,560,000+ | |
Union Cnty Ore Sch Dist No 001 La Grande 906429DW2
|
5.000% | 2035-Jun | - | 102.287 - 102.287 | 3.460 - 3.460 | 4 | $40,000 | |
University Oregon Gen Rev Ser A-bam-tcrs 914767AH1
|
3.500% | 2052-Apr | 79.367 - 79.367 | 82.540 - 82.590 | 4.606 - 4.610 | 8 | $500,000 | 3.223 |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Ref 937440DB8
|
3.500% | 2027-Jun | - | 99.945 - 100.499 | 3.164 - 3.516 | 6 | $60,000 | |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Ref 937440DJ1
|
5.000% | 2025-Jun | 102.380 - 102.380 | - | - | 1 | $45,000 | |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Deferred Int-ser A 937440DR3
|
N/R | 2038-Jun | - | - | - | 2 | $400,000 | |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Deferred Int-ser A 937440EZ4
|
N/R | 2037-Jun | 51.956 - 51.956 | - | - | 2 | $50,000 | |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Deferred Int-ser A 937440FJ9
|
N/R | 2046-Jun | 32.046 - 32.305 | 34.172 - 34.172 | 4.821 - 4.821 | 7 | $190,000 | 2.126 |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Deferred Int-ser A 937440FL4
|
N/R | 2048-Jun | 29.760 - 29.760 | 29.924 - 29.924 | 4.978 - 4.978 | 3 | $45,000 | 0.164 |
Washington Clackamas & Yamhill Cntys Ore Sch Dist No 88j Ser B 937440FW0
|
5.000% | 2029-Jun | 107.668 - 107.668 | - | - | 2 | $50,000 | |
Washington Cnty Ore Ser B 938234RW3
|
5.000% | 2028-Jun | 104.200 - 104.200 | 105.036 - 105.036 | 2.897 - 2.897 | 3 | $750,000 | 0.836 |
Washington Cnty Ore Ser B 938234RX1
|
4.000% | 2029-Jun | - | 101.522 - 101.666 | 3.300 - 3.360 | 4 | $240,000 | |
Washington Cnty Ore Ser B 938234SW2
|
4.000% | 2030-Mar | 101.043 - 101.043 | - | - | 1 | $75,000 | |
Washington Cnty Ore Ref 938234TJ0
|
5.000% | 2028-Jul | 108.493 - 108.493 | - | - | 1 | $50,000 | |
Washington Cnty Ore Ref 938234TP6
|
5.000% | 2033-Jul | 110.750 - 110.750 | - | - | 1 | $225,000 | |
Washington Cnty Ore Ref 938234TY7
|
3.000% | 2042-Jul | - | 99.875 - 99.875 | 3.024 - 3.024 | 2 | $900,000 | |
Washington Cnty Ore Sch Dist No 015 Forest Grove 938361PB2
|
5.000% | 2029-Jun | - | 109.814 - 109.814 | 3.060 - 3.060 | 1 | $10,000 | |
Washington & Clackamas Cntys Ore Sch Dist No 23 J Tigard 938395RQ5
|
5.000% | 2032-Jun | 105.597 - 105.597 | - | - | 1 | $40,000 | |
Washington & Clackamas Cntys Ore Sch Dist No 23 J Tigard 938395SA9
|
5.000% | 2027-Jun | 106.844 - 106.844 | - | - | 1 | $165,000 | |
Washington Cnty Ore Sch Dist No 48j Beaverton Ser B 9384292B2
|
5.000% | 2052-Jun | - | 106.427 - 106.427 | 4.100 - 4.100 | 1 | $70,000 | |
Washington Cnty Ore Sch Dist No 48j Beaverton 938429K30
|
5.000% | 2026-Jun | 100.741 - 100.741 | 100.749 - 100.749 | 3.581 - 3.581 | 2 | $140,000 | 0.008 |
Washington Cnty Ore Sch Dist No 48j Beaverton 938429K48
|
5.000% | 2027-Jun | 100.831 - 100.831 | - | - | 1 | $250,000 | |
Washington Cnty Ore Sch Dist No 48j Beaverton Conv Deferred Int-ser D 938429U88
|
5.000% | 2035-Jun | 104.727 - 106.044 | 104.977 - 106.182 | 3.140 - 3.492 | 4 | $5,020,000+ | 1.455 |
Washington Cnty Ore Sch Dist No 48j Beaverton Ref-taxable 938429V53
|
0.762% | 2024-Jun | 97.468 - 97.468 | - | - | 1 | $0 | |
Washington Cnty Ore Sch Dist No 48j Beaverton Ref-taxable 938429V79
|
1.227% | 2026-Jun | - | 91.218 - 91.218 | 4.950 - 4.950 | 1 | $205,000 | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307HX5
|
5.000% | 2026-Jun | 104.201 - 104.201 | - | - | 1 | $65,000 | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307JF2
|
5.000% | 2034-Jun | 106.399 - 106.399 | - | - | 1 | $1,000,000+ | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307JL9
|
5.000% | 2025-Jun | 102.101 - 102.101 | - | - | 1 | $10,000 | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307JM7
|
5.000% | 2027-Jun | 106.677 - 106.677 | - | - | 1 | $185,000 | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307KE3
|
4.000% | 2034-Jun | - | 103.698 - 103.698 | 3.365 - 3.365 | 1 | $10,000 | |
Washington Multnomah & Yamhill Cntys Ore Sch Dist No 1j Hillsboro 939307KL7
|
4.000% | 2040-Jun | - | 99.161 - 99.161 | 4.070 - 4.070 | 1 | $30,000 | |
Water Environment Svcs Ore Swr Rev 94115TAF8
|
5.000% | 2027-Jun | 106.237 - 106.237 | - | - | 2 | $90,000 | |
West Linn Ore 954039PK3
|
5.000% | 2033-Jun | 115.150 - 115.150 | - | - | 1 | $100,000 | |
Yachats Ore Rural Fire Protn Dist 984273AS1
|
5.000% | 2042-Jun | - | 102.438 - 102.438 | 4.250 - 4.250 | 3 | $75,000 | |
Yamhill Cnty Ore Sch Dist No 1 Yamhill-carlton 984646CA5
|
4.000% | 2025-Jun | - | 100.846 - 100.846 | 3.430 - 3.430 | 1 | $15,000 | |
Yamhill Cnty Ore Rev Ref-george Fox Univ Proj 98464TAP4
|
4.000% | 2024-Dec | 100.243 - 100.243 | - | - | 1 | $750,000 | |
Yamhill Cnty Ore Rev Ref-george Fox Univ Proj 98464TAU3
|
4.000% | 2029-Dec | 100.743 - 100.743 | - | - | 1 | $910,000 | |
Yamhill Cnty Ore Rev Ref-george Fox Univ Proj 98464TAW9
|
4.000% | 2031-Dec | 99.661 - 99.661 | - | - | 1 | $990,000 | |
Yamhill Cnty Ore Rev Ref-george Fox Univ Proj 98464TAZ2
|
4.000% | 2046-Dec | 88.294 - 88.294 | - | - | 1 | $1,500,000+ | |
Yamhill Cnty Ore Sch Dist No 029j Newberg Ser B 984657JK3
|
4.000% | 2031-Jun | 104.320 - 104.910 | - | - | 3 | $50,000 | |
Yamhill Cnty Ore Sch Dist No 029j Newberg Ser B 984657JT4
|
4.000% | 2039-Jun | 100.800 - 100.800 | - | - | 1 | $3,620,000+ | |
Yamhill Cnty Ore Sch Dist No 040 984674HU8
|
5.000% | 2025-Jun | 101.275 - 101.275 | - | - | 2 | $10,000 | |
Yamhill Cnty Ore Sch Dist No 040 984674HZ7
|
4.000% | 2030-Jun | - | 101.179 - 101.179 | 3.510 - 3.510 | 1 | $70,000 |
Login to your account |
Become a memberRegister for a MunicipalBonds.com account to get access to a whole new way of tracking, analyzing, and researching bonds.
...And much more
Register now » |
We are providing certain data supplied to us by the Municipal Securities Rulemaking Board ("the Service") without warranties or representations and on an "as-is" basis. WE HEREBY DISCLAIM ALL REPRESENTATIONS AND WARRANTIES (EXPRESS OR IMPLIED), BUT NOT LIMITED TO, WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE REGARDING THE SERVICE. You shall bear all risk, related costs and liability and be responsible for your use of the Service.
The transaction data provided through the Real-Time Transaction Subscription Service represents municipal securities transaction data made available by brokers, dealers, and municipal securities dealers to the MSRB and related information. Such transaction data and/or related information may not exist for all municipal securities and may not be required to be submitted to the MSRB for certain types of municipal securities transactions. The MSRB does not review transaction data submitted by submitters for accuracy, completeness or any other purpose, and does not warrant or guarantee the accuracy of any such transaction data and/or related information.
The MSRB, its officers, directors, employees, agents, consultants, and licensors shall not be liable or responsible to you or anyone else for any losses, injuries, damages, costs, expenses or claims caused by, arising out of or relating to the following: (a) acts, omissions, occurrences or contingencies beyond their control; (b) service interruptions or performance failures, such as those that result from the use of telecommunications facilities that are outside of their control, including the Internet: (c) negligence, gross negligence or willful misconduct in procuring, compiling, interpreting, editing, writing, reporting or delivering any of the content and material; (d) lost, stolen, late, corrupted, misdirected, failed, incomplete or delayed transmissions by anyone using the Service, including, but not limited to, any technical malfunctions, human error, computer viruses, lost data transmissions, omissions, interruptions, deletions, defects, hyperlink failures or line failures of any telephone network, computer equipment, software or any combination thereof; (e) damage to your computer systems, equipment, software, data or other tangible or intangible property resulting from or sustained in connection with your use of the Service; and/or (f) any disruption of business, lost sales or lost profits or any punitive, exemplary, indirect, special, incidental, or consequential damages associated or in connection with, resulting from or arising out of any use of the Service or the content and material in the Service.
The MSRB and its officers, directors, employees, agents, consultants, and licensors shall have no liability in tort, contract, or otherwise (and as permitted by law, product liability) to you or anyone else for any reason associated or in connection with, resulting from or arising out of your use of the Service. The MSRB, its officers, directors, employees, agents, consultants, and licensors make, and have made, no recommendations regarding any of the securities or other investment vehicles, referred to or described in the Service.
The Service is reproduced by permission of the MSRB under a non-exclusive license. The MSRB accepts no responsibility for the accuracy of the reproduction of the Service or that Service is current.